Analyze process

The Analyze process extracts information from Revit® into Openings Studio™, including PDF drawings, 3D building view, floor plan views, door schedules, and openings with associated parameters from the 3D model. These parameters are used to specify doors, frames, and hardware.

Use this procedure for a single model. For multiple models requiring separate specifications, repeat the process below for each model.

Note: For linked models, go to the Analyze Process with Linked Models.

 

To analyze a single model, follow the steps below.

 

1.  Open the project in Revit®.

 

2.  Verify the information in the Revit® Project Information Screen, Get started - Analyze project checklist

 

3.  Select Analyze from the Openings Studio™ tab on the Revit® Ribbon.

 

RevitRibbon

 

4.  The Analyze Wizard will display. To move from one tab to another, click Next at the bottom of the screen. 

 

Models 

If the current Revit® model contains linked models, these will be listed ( Analyze Process with Linked Models). Otherwise, click Next.

 

Models

 

Phases 

Select all doors and walls from each phase that are part of the Revit® model and door schedule. Click Next.

Helpful Hint!

  • Select Existing Walls if there are new doors located in existing walls.
  • Select Existing Doors if they will be modified with new hardware. 

 

Phases

 

Design Options 

If the Revit® model contains design options, they will be listed here.  Select any design options that contain doors that need hardware sets. Primary is selected by default. Click Next.

 

Design

 

Plan Views

Select plan views to be analyzed. Plan views do not need to have door tags. Click Next.

 

Plan Views

 

Uploads 

Browse and select any files to be included, e.g. floor plans, door schedules, door and frame elevations, life safety, and security plans.  Click Next.

Note: Please upload any PDFs of the floor plans (overall and area plans), door schedule, door elevations, and life safety drawings. If they are not ready, send them to your ASSA ABLOY Consultant when they are available. These are necessary for the specification writers to proceed. If no files are selected, a reminder prompt will display.

upload prompt

 

Uploads

 

Door Schedules 

Select relevant door schedules.  Click Next.

 

Door Schedule

 

Project Notes

Add additional project information. Click Next.

 

Project Notes

 

Analyze 

Click the Analyze button to being the process. Revit® will be unresponsive during this process. 

 

Analyze

 

5.  If the project has been previously analyzed, Openings Studio™ may open a window to compare current selections with previous selections. If the current selections are correct, click on the Continue button. To change the selections, click on Reselect

Helpful Tip!

This can also happen if the same project number has been used for multiple projects analyzed separately. Refer to Get started - Analyze project checklist.

 

revision

 

6.  The Analyze process will begin. Click on Show Details see a visualization of the process.

 Note: Analyze time may vary depending on the size of the project.

 

Show

 

7.  When Analyze is complete, the Openings Studio™ interface will display and the project will open automatically.  A confirmation will also be sent to both the architect and the ASSA ABLOY consultant.

 

Revit success

 